MAGAZINE
Print Subscriptions
E-Edition
Problem Corner
Archives
sub nav here
Professional Surveyor Magazine
August 2012 Volume 32 Issue 8
Articles
Editor's Desk:
The Future of NSPS
Feature:
Scanning London's Olympic Stadium
The Olympic Stadium is built from prefabricated steelwork components in a demanding workflow where the final design of successive components is adjusted to fit the verified deformation of each previously installed component. A team of experienced surveyors met this challenge, along with tight deadlines, to keep construction moving.
Feature:
Generating BIM Under Pressure
Laser scanning and automated feature extraction dramatically speed the process of 3D building information modeling for a $125 million hospital renovation in Ohio.
Feature:
Rising River Challenges
Hydrographic surveyors rely on a remotely operated survey vehicle mounted with a single-beam echo sounder and RTK GPS to survey water crossings for pipelines.
The Political Surveyor:
Waiting for Congress
Hardware Review:
Trimble VX Spatial Station
Web Waypoints:
Adding Data to Your Web Map
Business Leader:
Actionable Data Differentiates Today's Surveyors
Guest Editorial:
Surveying and Mapping Redefined
Intersect:
Is There Enough Turf for All Geospatial Professionals?
»
View other Issues in our Magazine Archive