chenchen12495
Posts: 839
Joined: 8/9/2016
|
construction site in time and shall not |
Flag »
Reply »
|
serious problems to meet in time, tripartite consultations, Timely rectification. In the concealed works, sub-projects and the completion of the project, the owners should go to the scene with the acceptance, before continuing construction (except in exceptional circumstances). In addition, the owner shall supply the material to the construction site in time and shall not affect the progress of the project. So in the home decoration supervision is in a very core position, the owners generally do not understand this piece of
decoration, and usually not much contact, let alone construction, technology and other professional issues, so this time supervision will Play a good role to help our owners to identify and solve problems to protect our progress and quality of construction.Since NEST was $ 3.2 billion acquisition of Google, the entire smart home industry are very excited about NEST news overwhelming, all of a sudden NEST's intelligent thermostat and Smoke Detector Thermostat is well-known, the author as the smart home industry
People have long known this intelligent thermostat products, and want to introduce this product to domestic use, but a detailed understanding of the NEST of this thermostat and found that this product is for the US home air conditioning system used ( The US air-conditioning system using the 24V control voltage), so the use of a great domestic difficulties, including air-conditioning systems are different with the domestic. Even the NEST UK official website has only launched a smart smoke sensor, nor the
starboard to replace boat deck
renewable resources journal by impact factor
plastic shower wall panels price
|
|
|
Wednesday, October 26, 2016 at 3:35:44 AM |