Synchronous gravel waterproofing layer 

Professional Surveyor Boards » In the News » Synchronous gravel waterproofing layer

Name Message
qizhenapp
Posts: 74

Joined: 6/30/2016
Topic  Synchronous gravel waterproofing layer       Flag »  Reply »

Project Overview

Yichang to Zhangjiajie Expressway north of Yichang, Nantong Zhangjiajie, is to communicate Western Hubei, western Hunan Province, the inter-provincial fast-track. Yichang to Zhangjiajie highway Hubei section is the "highway and waterway transport development in Hubei Province" second five "plan" in the planning of the "seven vertical and five horizontal three-ring" highway network six - Yunxian to Yichang (E Xiangjie) highway Of the highway, the highway channel from the meteorite ten, ten rooms, Paul Yi, Yi Zhang and other expressway project composition.

According to the project division, the Hubei section of Yichang-Zhangjiajie expressway is divided into Dangjiang-Zhijiang section, Baiyang section of Yangtze river bridge section, Yidu-Wufeng section (hereinafter referred to as "the project"), Wufeng Off) to E Xiang sector. After the implementation of the project, will work with other relevant sections, open up the Yichang South express delivery channel, its construction for the optimization of regional highway network layout, give full play to Yichang provincial deputy center of the city's radiation driven role, strengthen Yichang Three Gorges Project To promote economic and transport links between Hubei and Hubei provinces and promote the integration of the "One River and Two Mountains" and the world-famous scenic spots such as Zhangjiajie in Hunan, promote resource development in Hubei Wuling hinterland, , To promote Yidu, Wufeng along the region, especially a few ethnic areas of economic and social development, are of great significance.Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery

 Training professional conservation team

In the implementation of specialized conservation under the premise of training to create a highway to adapt to the characteristics of the professional conservation team, and gradually implement the bidding system, the maintenance work to socialize, to encourage the professional conservation team to strengthen internal management accounting mechanism , Improve competitiveness, is conducive to the operation of the entire rural road management.

In short, the role of rural roads and the characteristics of its conservation and management of the importance and particularity. The application of synchronous gravel seal in rural road maintenance can improve the running quality and economic benefit of rural road.

expansion joints vs control joints driveway crack filler reviews concrete vibrator meaning
  Tuesday, January 3, 2017 at 9:57:34 PM

Professional Surveyor Boards » In the News » Synchronous gravel waterproofing layer

 
» Reply to Synchronous gravel waterproofing layer Topic

In order to post a new message, you must first be logged into an account.