With a floor heating system requirements 

Professional Surveyor Boards » Ask an Expert » With a floor heating system requirements

Name Message
chenchen12495
Posts: 839

Joined: 8/9/2016
Topic  With a floor heating system requirements       Flag »  Reply »

Heating system environment is more complex, higher thermal conductivity of the floor, dimensional stability requirements. In order to ensure better heat conduction and prevent deformation of the floor, you should choose a thickness no greater than 8mm laminate flooring. While the average thickness exceeding 8mm solid wood flooring, bamboo flooring, solid wood flooring and laminate flooring it should not be used to warm the system of the occasion.

Before laying claim: pre-construction must heating system for heating water to detect water temperature of at least 50 ?, heating system is operating normally, and incubated for 12 hours or more. Confirm no leakage before construction. Not the above tests will not be construction. Construction method does not allow the destruction of the surface, so as not to damage the cooling coil. Cold areas in winter construction, flooring should be stored in advance in the field more than 12 hours in order to adapt to changes in temperature, reducing the deformation of the floor. Before installation you should check the ground is flat, dry, clean windows and doors are complete, related facilities for leaks, check the door and the ground clearance is adequate.

The special mat neatly laid on the ground, at the interface with the adhesive tape seal. Flooring trend, the long side of the floor should be consistent with the direction of light in the room, the installation of the first row of the long side of the groove to the floor between the walls, the floor and the wall into the wedge, ensure the floor stretching gap 8-12mm, rows and rows the seam between the floor should be installed wrong, and wrong seam distance should be greater than 20 cm. Laying should always observe the difference between the height of the plate surface, cracks and other defects, after passing the order and immediately remove glue splice plate surface residual glue. Within 12 hours after installation can not walk on the floor, other follow-up operations should be carried out after 24 hours. Flooring longer than 8m, or room, at the interface between the coupling hall, hall, floor to be cut off, leaving 8-12mm expansion joint and connected by bars shut to reduce the occurrence of bagging floor.

Related links:

environmentally friendly flooring

garden decking

outdoor fence

  Friday, August 19, 2016 at 4:02:52 AM

Professional Surveyor Boards » Ask an Expert » With a floor heating system requirements

 
» Reply to With a floor heating system requirements Topic

In order to post a new message, you must first be logged into an account.