Outdoor floor construction procedures and routine maintenance 

Professional Surveyor Boards » Ask an Expert » Outdoor floor construction procedures and routine maintenance

Name Message
chenchen12495
Posts: 839

Joined: 8/9/2016
Topic  Outdoor floor construction procedures and routine maintenance       Flag »  Reply »

1. Construction conditions: Before the construction of outdoor wood construction must be completed and to be clean, the quality of the ground construction must meet the design requirements of architectural drawings.[url=http://externalfloor.com/product/3468.html ]tongue groove composite 2x6[/url] recycled plastic interlock fencing looks like wood Decorative lighting and other may affect the outdoor wood works to wait until after the end of its construction to avoid cross-construction of outdoor wood construction and maintenance impact;

2. keel to take the suspension laying method: the keel in the base plane can be connected into a framework / frame structure, and then laying outdoor floor; basic keel spacing is generally horizontal and vertical 30-50CM (determined by the outdoor floor thickness), keel spacing The height of more than 50cm, the foundation must be further reinforced (angle or stakes, the other);[url=http://externalfloor.com/product/4614.html ]slip proof decking facts[/url] tongue and groove composite porch planks part of the wooden structure, if necessary, should also be done drainage treatment: such as wood keel Wood keel according to customer requirements brush fire retardant coating (price extra); (preservative wood keel installation diagram and notes separate note)

3. Floor installation: the installation of outdoor flooring, wood to be left between the gap 0.2-1CM (according to the wood moisture content and then determine the gap size, wood moisture content of more than 30% should not exceed 0.8CM as well) to avoid the rain product Water and wood expansion;whats the best composite deck mat [url=http://externalfloor.com/product/4665.html ]yale composite doors[/url] floor interface must be flat, the other should be rounded treatment, so that no significant level difference, no obvious loosening, the overall laying of flat solid;

  Tuesday, October 11, 2016 at 3:29:46 AM

Professional Surveyor Boards » Ask an Expert » Outdoor floor construction procedures and routine maintenance

 
» Reply to Outdoor floor construction procedures and routine maintenance Topic

In order to post a new message, you must first be logged into an account.